Project Insights

Project Overview

A concise summary of the client brief, context, and key outcomes.

Downer engaged Magical Link on behalf of NBN to deliver an M7/M12 fibre build for a portable office—where 5G was dropping out and civil engineers needed a rock-solid link. Working beside an active construction site with no existing underground NBN infrastructure, we had just two weeks from survey to handover.

Key Outcomes

  • Physical installation completed in just two days
  • Fast, stable connection with zero dropouts
  • Client delighted with on-time, high-quality delivery
Our Approach

How We Delivered

The core steps we took to meet project goals on time and on budget.
  1. Detailed site surveys to minimise civil works and delays
  2. Hauled NBN fibre 2 km through pit & pipe infrastructure to the comms room
  3. Installed new fibre joints in underground pits
  4. Deployed a technician with a FUJIKURA 88R splicer to fuse FSL-12F to SDS-1F cable
  5. OTDR testing (12 km loop) to verify cable integrity end-to-end
  6. Activated the SFP to switch on the signal to the NOKIA 7210 SAS-K device
  7. Used Tera Term to automate BNTD configuration and data collection
  8. Laid final cabling and installed NBN gear to future-proof for more customers
Our Client's Review

What Client Say

A concise summary of the client brief, context, and key outcomes.
“I have worked closely with Magical Link for the past three years, and they consistently demonstrate professionalism and expertise in every aspect of their work. Their efficient, customer-focused approach ensures they go above and beyond for any request, big or small, earning our trust on every project. I admire their dedication, perseverance, and unwavering commitment to quality.”
Joanna Edwards

Project Coordinator, Downer